Olympic Gymnastics Centre
A hall for international competitions: uniformity, no flicker, workable for broadcast.
≈ 500 lx
A sports hall, a karting track, a workshop, a warehouse, a car park, a fuel station, a facade and a business centre: eight sites in and around Tashkent, photographed after installation. Where before-and-after readings exist, light went up 2 to 3 times and power fell 1.8 to 3.5 times.
We give area, luminaire count and saving as estimates and confirm them against the handover records. Exact values come with the engineer's calculation for your own facility.
Facility type
A hall for international competitions: uniformity, no flicker, workable for broadcast.
≈ 500 lx
High-bay luminaires at hall height, light across the full floor without shadowing from the structure.
Architectural facade lighting and canopy lighting, filmed in September 2024.
Replacing the old lighting in a workshop: illuminance at the working plane and dust resistance.
Light along the trading aisles and in the storage zone, linear luminaires in a continuous run.
Lighting for the canopy and the forecourt: IP65 on the columns, IP54 under the canopy, operation in the heat.
Underground car park: linear light along the drive lanes, round-the-clock operation.
Lighting the construction site and the grounds before handover.
No project of this type is published yet. Clear the filter or write to us: the engineer has a calculation for a comparable site.
26 clients from our quotation, by sector.
Send a floor plan or your technical specifications: we return a DIALux calculation with isolux contours, a bill of materials and a payback period. The calculation is free.