+998 97 771 11 83 Downloads For state customers
Prom. Industrial suspended luminaires. Sila Sveta. Visualisation based on a photograph of the actual product: the background and lighting are AI-generated, the geometry and construction match the product
Visualisation based on a photograph of the actual product: the background and lighting are AI-generated, the geometry and construction match the product

Industrial suspended luminaires

Prom

Workshops, warehouses, hangars and sports halls, mounting heights 4 to 30 m. Cable or hook, IP54, four colour temperatures. The 600 W floodlight is quoted against your technical specifications.

Models
5
Power
50 to 600 W
Ingress protection
IP54
Colour temperatures
4000 / 5000 / 5700 / 6500 K
Mounting height
4 to 30 m
Price from
459,200 UZS

Price includes 12% VAT. Price list dated 30 March 2026.

Model comparison

Key parameters of the Prom series. The table scrolls sideways.
Model PowerLuminous fluxIngress protectionMounting heightPrice, UZS
SVO 01 Prom 50W 50 Wup to 9,000 lmIP544 to 30 m459,200
SVO 01 Prom 100W 100 Wup to 18,000 lmIP544 to 30 m811,440
SVO 01 Prom 150W 150 Wup to 27,000 lmIP544 to 30 m1,064,000
SVO 01 Prom 200W 200 Wup to 36,000 lmIP544 to 30 m1,400,000
Prom 600W floodlight 600 Wup to 108,000 lmIP54per projectper project

Models in the series

Prices from the price list of 30 March 2026, 12% VAT included.

Series files

Photometry, price list and the archive catalogue. Everything downloads without a form.

All downloads

Questions about this series

How is the Prom series mounted?

Mounting height is 4 to 30 m. Fixings are supplied with the luminaire, and mounting dimensions come with the calculation. Your contractor installs; our engineer visits on request.

Which colour temperature should I choose?

Factory floors and warehouses: 4000 or 5000 K. Streets and plant grounds: 4000 K. Retail and offices: 3000 or 4000 K. The value is fixed in the order and cannot be changed later.

What does the 3-year warranty cover?

Both failure of the luminaire and a drop in luminous flux; the terms are written into the contract. A faulty luminaire is replaced.

What is the lead time?

It depends on the batch size and the production load. We state it in the quotation.

Get a free calculation

Send your technical specifications or floor plan: an engineer works out the illuminance in DIALux, the number of luminaires and the payback period.